Service Area

Ironhouse Sanitary District: Oakley & Bethel Island

Oakley and Bethel Island share one sewer agency and one strict rule: before a property sale closes, Ironhouse Sanitary District wants a camera inspection of the lateral and a Compliance Certificate in hand. We record that inspection the way the district asks for it.

One District, Two Communities

Who Runs the Sewer in Oakley and Bethel Island

Ironhouse Sanitary District is the special district responsible for the public sewer system in both Oakley and Bethel Island. Sewer permits in either community come from Ironhouse, not from the city or the county.

The district draws a clear line. Every private sewer — the building sewer, the lateral, and any private main — belongs to the property owner up to and including the connection to the public main. The owner is responsible for keeping it in working order, and for any overflow it causes.

That is why Ironhouse ties so many events to a camera inspection. The lateral is out of sight, the owner is on the hook for it, and a recorded video is how the district decides whether it is sound.

  • ✓
    CCTV lateral inspections recorded to Ironhouse's rules
  • ✓
    Address stated at the start of every video
  • ✓
    Recorded video and a written report, usually within 1–2 days
  • ✓
    Root cutting and hydrojetting when the line needs cleaning first
  • ✓
    Owner on every job, family-owned since 2001
Schedule in Oakley or Bethel Island
Ironhouse Sanitary District Certificate of Compliance
CCTV sewer lateral inspection for an Ironhouse Compliance Certificate
Point of Sale

Every Sale Needs a Compliance Certificate

Under Ordinance 65, as amended by Ordinance 83 in 2024, a property sale in the district requires a CCTV inspection and a Compliance Certificate before the close of escrow. If there is no escrow, the certificate is due before the deed is recorded. There is no age exemption: a newer home needs one just like an older one.

The one way around a new inspection is a certificate that is still in force. Once Ironhouse issues a Compliance Certificate, the lateral does not need testing again for 20 years — unless the district has reason to believe it has become defective, or one of the other triggers below occurs.

Timing matters here more than in most places. The owner or the owner's agent must notify the district of the inspection date and time at least 7 calendar days ahead. The video then goes to the District Engineer for review, and a review fee applies. An inspection is valid for 6 months, so it can be done early in a listing without going stale.

Compare District Requirements
What the District Checks

What It Takes to Pass

The District Engineer issues a certificate when the inspection shows a lateral that is free of roots, grease and other solids; has no improper connections such as sump pumps, downspouts or area drains; has tight, sound joints; and has no cracks, breaks, missing pieces or major sags and offsets, including where it joins the public main.

Cleanouts count too. To qualify, the lateral needs a cleanout within 18 inches of the building's footprint, one at the property line, and one for every 100 feet of continuous pipe. Those cleanouts are also where the camera goes in, so knowing where yours are before the inspection saves time on the day.

That list is why a clean line matters before the camera goes in. Roots and buildup can hide the condition of the pipe, so when a lateral needs it we cut roots or hydrojet first, then record the full length from the cleanout to the public main. Your report notes what the camera saw at each of those checkpoints, usually within 1–2 days.

Sewer cleanout near a building foundation
Pipe Cam, Inc. service van
Beyond the Sale

Other Events That Call for an Inspection

A sale is the trigger most people meet, but it isn't the only one. Ironhouse also requires a CCTV inspection and a Compliance Certificate after a qualifying sewer lateral service call, after a single sewer overflow caused by the private line, when the district discovers unpermitted work, and on subdivision of a property.

Remodels can trigger it as well. A building permit above the district's valuation threshold needs an inspection and certificate before final inspection or a certificate of occupancy, unless the lateral was inspected and certified in the previous 20 years. A change of use, such as residential to non-residential, is a separate trigger of its own.

Owners in Oakley's newer subdivisions and on the island's waterfront streets face the same rules. If you're planning a remodel or a sale, a camera inspection now tells you where you stand before a deadline is attached to it.

Ironhouse Sewer FAQ

Oakley and Bethel Island Sewer Questions, Answered

Do I need a sewer inspection to sell my house in Oakley?

+

Yes. Ironhouse Sanitary District, which serves Oakley and Bethel Island, requires a CCTV inspection of the lateral and a Compliance Certificate before the close of escrow, or before the deed is recorded if there is no escrow. There is no age exemption. The only exception is a certificate that is still in force.

How long is an Ironhouse Compliance Certificate valid?

+

Twenty years from the date it is issued, unless the district has reason to believe the lateral is defective or another trigger occurs, such as an overflow or unpermitted work. The CCTV inspection itself is valid for 6 months.

How much notice does Ironhouse need before the inspection?

+

The owner or the owner's agent must notify the district of the inspection date and time at least 7 calendar days in advance. Build that week into your escrow timeline.

Does my lateral need a cleanout to get a Compliance Certificate?

+

Yes. The certificate requires a cleanout within 18 inches of the building's footprint, one at the property line, and one for every 100 feet of continuous pipe, plus a backflow prevention device where the ordinance requires one.

How soon will I get the inspection report?

+

Usually within 1–2 days after the inspection. We can usually get you on the schedule within a few days, depending on our workload and your availability — plan around the district's 7-day notice as well.

Other service areas: Tri-Valley · Central Contra Costa County · East Contra Costa County · Lamorinda · Castro Valley · Southern Solano County · Tracy / Mountain House · Hayward & Niles · West Contra Costa County

Selling in Oakley or Bethel Island?

Honest, transparent pricing, owner on every job, recorded video and a written report — usually within 1–2 days. We can usually get you on the schedule within a few days, depending on our workload and your availability.